We continue with the work!
The loft room (Aaron and Kylie's bedroom) is now receiving its second wardrobe fitting as I write this.
Walter and Aaron looking very happy as they have achieved success with the wardrobes at long last! The roof slopes which makes the job very difficult.
Aldert has finished moving the doorway and has put walls in to separate the laundry and study from the small hallway. I think Kylie must be getting sick of vacuming up all the dust each day.
I moved the barbeque, outside toy box, roofbox and other bits and pieces onto the old garden bed (covered in plastic) in readiness for the building of the back extension.
Mia and Abi discovering items from their outside toy box, not seen since leaving Norwich!
There will be a 2 1/2 metre extension on the back of the house, which will give so much extra room inside the house plus lots of light as it will have glass in the roof. Raphy now escapes everytime the door is left open. So much to discover!
Mia (on her green machine) and Abi enjoying playing in the sunshine.
The weather is warm as well.
No comments:
Post a Comment